CCMA ENVIRONMENTAL RIVER BANK PROJECT

Floods in the recent years have taken a toll on the integrity of the banks on the Tennessee river. This was a simple fix, but the logistics were not so easy. We repaired the scours the river had cut into the existing bank with 125+lbs rip rap and a massive 100 ft long concrete structure to the engineers specs in a safe and environmentally friendly way. Turbidity barriers were deployed to ensure we were not disturbing the muscles down stream, and proper equipment and personnel were on site to ensure a safe and efficient working environment.